Germany starts second tender in 2018 for onshore wind power
Federal Network Agency
Germany’s Federal Network Agency (BNetzA) has started the second auction for onshore wind power in 2018. The tendered volume is about 670 megawatt and bids can be submitted until 1 May, the BNetzA says in a press release. The maximum support level is 6.3 cents per kilowatt hour. Contrary to earlier auctions in 2017, citizens’ energy cooperatives lose their privilege to submit bids without having obtained a construction license first.
Find the press release in German here.
Find background in the CLEW factsheet High hopes and concerns over onshore wind power auctions.
All texts created by the Clean Energy Wire are available under a
“Creative Commons Attribution 4.0 International Licence (CC BY 4.0)”
.
They can be copied, shared and made publicly accessible by users so long as they give appropriate credit, provide a
link to the license, and indicate if changes were made.