News Digest Item
21 Nov 2018

Germany begins trial to curb grid congestion

Montel

Around 70 partners, including grid operators, power producers, consumers, and traders in eastern Germany, have launched a trial to find cheap and efficient ways of resolving costly grid congestion on windy days, for example by using demand flexibility, reports Nathan Witkop for Montel. “We need to build power line networks if the energy transition is to succeed, but networks alone will not suffice,” Dirk Biermann, head of the eastern German grid operator 50Hertz, told reporters in Berlin. Integrating large volumes of renewable energy would require “intelligent solutions” that make the most use of existing infrastructure, he added.

Read the article in English here.

For background, read the dossier The energy transition and Germany’s power grid.

All texts created by the Clean Energy Wire are available under a “Creative Commons Attribution 4.0 International Licence (CC BY 4.0)” . They can be copied, shared and made publicly accessible by users so long as they give appropriate credit, provide a link to the license, and indicate if changes were made.

Journalism for the energy transition

Get our Newsletter
Join our Network
Find an interviewee